Notify the other party of the contract the time of acceptance of the material


   After the material has been procured, the purchaser will be required to inform the other party of the contract about the acceptance of the material. And this acceptance is best arranged immediately when the material comes into play. Therefore, the agreed acceptance time is necessary. So as to avoid the material entering the market, the other party does not have time to check the materials and affect the construction progress.


   Acceptance of materials specified in the contract must be present at the time of material acceptance


    Whether it is home improvement industry or consumers, it seems that the contract did not rise to the kind of awareness of the legal point of view. However, the home improvement contract itself is a legal instrument, which can cause unnecessary trouble if not taken seriously. Take the material acceptance as an example: In the relevant chapter of the home improvement contract, the author once suggested that the material acceptance should be clearly verified. However, in actual operation, both Party A and Party B in the contract often fail to take the materials acceptance person stipulated in the contract seriously. Perhaps the acceptance of the provisions of the acceptance is not present (the acceptance of the contractor there is no contract authorize the authorization), perhaps the acceptance of the presence of the scene but did not assume the responsibility of acceptance. Strictly speaking, there are legal loopholes in doing so. Acceptance procedures must be strict Acceptance of the contract stipulated in each material agreement should be carried out the necessary checks, such as material quality, material specifications, the number of materials. When a formal decoration company signs a contract with a customer, it will also sign a material statement detailing the brand, specification and quality level of the required materials. Both parties shall accept the materials according to the material instruction sheet. As material orders generally do not state the quantity of material, consumers should state the quantity of material to be accepted in the acceptance form.


  Acceptors stipulated in the contract should sign the receipt


    If the inspection results of the material pass, the acceptance of people should sign the material acceptance. This is a more complete process. Because, I encountered such a thing, the owners entered the material when the material was accepted, but did not perform the necessary formalities. Afterwards, the owner regretted, but also do not admit their acceptance results. However, since there is no evidence on the other hand, there is no solution to such an outcome.