How to accept the list of decoration materials
date:2017-10-10 18:38:39

Notify the other party of the contract material acceptance time

   After the material is purchased, the purchaser will need to notify the other party of the contract to prepare the material for acceptance. And this acceptance is best arranged in the material approach immediately. Therefore, the acceptance time is very necessary. So as not to appear when the material approach, the other side of the material does not have time to accept the impact of construction progress.

   Acceptance of personnel during the acceptance of the material must be present

    Whether it is home improvement industry or consumers, it seems that the contract did not rise to the legal point of view of the kind of consciousness. However, the home improvement contract itself is a legal instrument, if not taken seriously there may be unnecessary trouble. Acceptance of materials as an example: In the relevant section of the home improvement contract, the author has suggested that the material acceptance should be clearly acceptance. However, in practice, the contract of both parties tend to contract the provisions of a good material acceptance did not take seriously. Perhaps the acceptance of the acceptance of the person is not the scene (the acceptance of personnel and no contract agreed to the recipient), perhaps the acceptance of the scene but did not bear the responsibility of acceptance. Strictly speaking, there are legal loopholes in doing so. Acceptance procedures must be strictly accepted by the person in the contract specified in each material agreement should be necessary to check, such as material quality, material specifications, the number of materials. Regular decoration company signed a contract with the customer will also sign a description of the material, the details of the required material of the brand, specifications and quality level, the two sides should be based on material description to accept the material. Since the material is not generally stated for the quantity of material, the consumer should specify the quantity of acceptance material in the acceptance slip.

  The acceptance of the contract specified in the contract should be signed on the acceptance

    If the inspection results of qualified materials, the acceptance of the material should be signed on the single sign. This is a more complete process. Because the author encountered such a thing, the owners of materials in the material on the acceptance, but did not fulfill the necessary procedures. Afterwards, the owners and regret it, and their acceptance results do not admit. However, because there is no evidence in the other hand, there is no way for such a result.